Briquette Machine: Sawdust Briquetting machine. This machine is well suited for recycling various forms of biomass and agricultural waste into sawdust and molding it into shaped briquettes. It is used to summarize the waste space into high-density fuel, easy to transport and store.
This machine has advantages such as low power consumption, environmental friendliness, high working efficiency, longer life, low crushing rate and low maintenance. Briquettes can be used as power plants and heating for buildings / residences.
Briquette raw material:
•
animal
feed, sawdust, straw (rice / wheat), corn stalks, peanut shells
•
woody
twigs, cottonseed husks, shrubs, and other agricultural wastes. Parameters of
briquettes obtained:
•
Density
1.1-1.3 g / cm3
•
Fuel
value: 3,700-5,000kcal / kg
•
SO2
emissions: 0.38% (lower than the national standard 1-3%)
•
CO2
emissions: 0.22% (well below national standards)
•
Residual
ash: 3.6%
• Environmentally friendly & can be recycled as agricultural potash fertilizer.
The layout of the WP production plant can be seen here with a capacity of around 1-1.5 tons / hour (Cooling Section Rp.203 million, CNF Jakarta).
Furthermore, for a capacity of 2-3 tons / hour the form of the machine can be seen here. Price (Sep 2018) for one unit of Production Line (10x 50m) Rp. 2,2M (CNF Jakarta).
of largest engine capacity, 25 tonnes / hr, also available (Layout can be seen below)
Image
Captions: 1) Wood Crab; 2) Machine crushed (powder); 3) Bin (container); 4)
Dryer; 5) Pellet machine; 6) Cooler; 7) Packing Machine. Factory size:
150x30m2; Power: 5689kW; Workers: 12 people.
The process
consists of:
1. Wood Chipper
Process: Prepare logs to be used, then crab logs with a size not more than 2-5
cm.
2. Hammer Mill:
Hammer mills are used to pulverize wood chips into sawdust (wet) with a size
below 3-6 mm.
3. Drying Process
(Dryer): In order to meet the conditions of the pelletization process, the
drying process is needed to reduce the moisture content of the raw wood powder
(wet), so that the moisture content is not more than 15%.
4. Pellet Making
Process (Pellet Machine): pressing dry wood powder (<15%) with a pellet mill
through roller and die contact. A vertical pellet machine should be used at
this stage.
5. Sifting
Process (Sieve Shakes): Sieve the low quality pellets (split, broken,
collapsed) during the sieving process. Separate the unsuitable shapes via the
vibrating sieve as well as get rid of them through the sieve, then the failure
is reprocessed.
6. Process
Cooling (Cooler): Cooling the temperature of the pellets. When the pellets come
out of the pellet mill, the temperature of the pellets is around 60 oC. After
passing through the cooler, the pellet temperature is slightly higher (5-10 oC)
than the ambient temperature.
7. Packing process
(Packing machine): packing pellets for 10-50 kg / container.
South Korea is
conducting joint projects in East Java, Central Java, Sumatra, Kalimantan and
Papua. Indonesia will be South Korea's target to become a supplier of WP in the
future in Asia, especially for biopelet materials from furniture waste, palm
fronds, EFB, sugarcane bagasse, straw, red calliandra, sawdust, etc.
North Sumatra
(Medan): PT Toba Hijau Sinergi which operates at the end of 2016 utilizes EFB
palm (TKKS, oil palm) to become oil palm pellets used as alternative BB
according to Law No.32 of 2009. The advantages of oil palm pellets are low
humidity, efficiency high thermal energy, easy handling & storage, suitable
for lattice system boilers, and low smoke output. Unfortunately, the ash
content is> 3%.
Processing 1
ton of FFB (Fresh Fruit Bunches) produces waste of 0.23 tonnes of EFB; 0.13
tons of mesocarpfibre (fibers); 0.06 tonnes of palm shell, and 0.65 tonnes of
LCPKS (Palm Oil Mill Liquid Waste). TKKS has only been used as compost (mulch).
The processes used include:
Empty Bunch
Crusher, Thresser, Empty Bunch Press, Shredded Empty Brunch, Cutter, Dryer,
Bricket Machine, and Bricket Bunker. Assumptions: EFB (in FFB) 23%, PKS
processing capacity 30ton / h, EFB produced ~ 6.9 ton / hr. One unit of 7ton /
h capacity shredder is required. In brief, the process of making wood pellets:
OPEFB is crushed (crushing), shredded (thressing), pressed (pressing) to reduce
the moisture content, and pick up the remaining oil; then via conveyor it is
sent to the drying unit (drying), cutter (cutting, max. 2 inch) and so on to
the Tankos pellet machine. PKS capacity 30 thousand kg / h or 600 thousand kg /
day, TKKS 138 thousand kg / day, OPEFB Pellets (40% of EFB) 55,200 kg / day,
heat tilapia Tankos pellets 17,660kJ / kg (4,640kCal / kg), potential heat of
pellets 974,832 .000kJ / day. Five kg of tankos pellets is equivalent to 12 kg
of LPG gas cylinders. The tankos pellet machine alone costs ~ 33,000 USD.
Riau Kep:
IDEAS in collaboration with PT APP (Achmadi Pasca Perintis) conducted a survey
to develop an energy plantation and WP mill in Lingga (There are around 604
large & small islands).
•
West
Java: WP factory in Ciamis, capacity of 2,500 tons / month (60% for domestic,
40% for foreign)
•
DI
(Dahlan Iskan) has visited the WP factory (2x350kg / h, raw material for KM) Ds
Rawa, Kec. Cingambul, Kab. Majalengka; to a tempe factory in Dukuh Semar,
Cirebon, which tried WP Kaliandra.
•
DEAS
and PT MBT (Mandiri Bintang Tiga) collaborate to develop calliandra energy
plantations and WP factories in Sumedang, Kuningan and Bandung
•
Central
Java: the largest wood pellet factory PT South Pacific, a furniture producer in
Jepara, Central Java, produces WP from waste from furniture production which is
popular in South Korea (70,000 tons / year), because of its good quality (high
calories, chemical content and low enough ash). Four WP mills are planned to be
built in biomass plantation centers in various locations (Max about 4 hours
from Bandar Internasional).
•
PT
SPI (Solar park Indonesia, in Kalikajar, Wonosobo Central Java), which was once
predicted as a pilot project for wood-based biomass investment opportunities
(as well as a WP factory) between South Korean Indonesia (200,000Ha) has been
locally owned. Now it is being sold (Rp. 19.5 billion) to other parties (some
of the machines have even been stripped down, and sold in pieces).
•
Semarang:
PT Mahya Bioenergy, capacity 2,000 tons / month (max 10,000 tons / month),
albasia wood, 4200-4600 kcal / kg, diameter 8mm, water content 7-9%.
•
Purworejo:
PT EMI (Energy Management Indonesia) (a state-owned company via its subsidiary
PT EBI) made cooperation with the Purworejo district government to build a new
WP factory originating from red calliandra wood with a capacity of 36,000 tons
/ year. The production is to fulfill the demand of domestic taxpayers (250 tons
/ day) and Japan and South Korea foreign countries, which increase by 250 tons
/ day (10,000 tons / month) via LOI. Factory area 10 Ha.
•
DI
Yogyakarta: One of the suppliers of WP (50 tons / month) to South Korea (and
Japan) is PT Greeno Inovasi Energi from Ds. Among, Bangunjiwo, Bantul, DIY. The
main raw material is sawdust obtained from Central Java & DIY, which is
mixed with other biomass wastes such as rice husks, bagasse (bagas), tobacco
dust, and waste banknotes. Tapioca flour is added to it as an adhesive.
•
East
Java (Paiton, Probolinggo): PT Pellet Biomass Indonesia, producer of premium WP
(calories 4600kcal / kg; moisture 8%; ash content 1.2%; minimum order: 16
tonnes; Surabaya port; 1 month delivery time; L / C, T / T; able to supply:
2000 tons / month).
•
Madura:
April 2015, CV Gerbang Lestari established a WP factory which is managed by
Ponpes Darul Ittihad in Ds. Kombangan, Kec. Geger, Kab. Bangkalan, Madura with
a capacity of 1 ton / h with red calliandra wood as raw material of about 12
tonnes / day (1 day = 8 hours, wet raw material contains about 40% water). If a
year = 310 days, then 12ton x 310 = 3720 ton / year of raw material is needed,
or 3720/20 = 186 Ha of land is needed. Therefore, the harvested garden per day
is only 186 Ha / 310 = 0.6 Ha. KM wood pellets selling price Rp. 1.6-2.5
million / ton. Meanwhile, the selling price of KM wood is only Rp. 367,000 /
ton. After production is managed by ISE (IDEAS Semesta Energy, the machines are
rejuvenated by CV SBE, Suryabaja Engineering), WP 2 tons / hour or 25 tons /
day (a mixture of KM and Kemlandingan) was sent to Gresik, and PTPN 8 in
Pangalengan,
•
Bandung
(for BB drying tea leaves). Local users are starting to use WP as a substitute
for LPG gas which can save 47% costs, which is equipped with the use of a WP
stove in one package with the WP. The idea will also be developed in Mamuju
(Sulbar) and North Lombok (NTB). Kaliandra red wood is harvested after 14
months by CV Gerbang Lestari. The optimum production is 20 tons / Ha / year.
The local people took advantage of the calliandra energy plantation project in
a 214 hectare village forest and a 200 m2 WP mill (assistance from ICCTF,
Indonesia Climate Change Trust Fund). Meanwhile, the WP product is used as a
197kW BB PLTBm. ISE designed a 1.5 ton / h WP factory in Bangkalan Madura,
Mamuju (Sulbar) 2 tonnes / h, Karangantu, Banten, and PLTBm in Ds. Selengen
& Salut in North Lombok, NTB. This moment Madura wood pellet factory is in
a state of suspended animation, lack of spare parts for pellet machines that
are broken.
•
South
Kalimantan: PT Jhonlin Agro Mandiri (PT JA) built a WP factory in an area of 2 hectares
with a capacity of 4 tons / hour with fully automatic machines. The raw
materials come from Jabon, Gmelina, Sengon, and Acacia wood which are planted
on an area of 15,000
hectares. Target: WP exports to South Korea and Europe.
•
PT
Inhutani III supplies raw materials for eucalyptus, sengon and gamal grown on
an area of approximately
5,000 hectares, Pelaihari, South Kalimantan, to the WP factory built by PT SL
Agro Industry (a South Korean subsidiary, Depian) with a capacity of around
100,000 tons (2015) . Furthermore, PT SLAI supplied WP from its factory to the
South Korean company Western Power Co. Ltd. Kerma Inhutani III with China was
also signed, and Inhutani III prepared 5,000 hectares of land. 2x10MW PLTBm
made of wood chips (140,000 tonnes) was also built to support the factory's
electrical power, while the remaining electricity was sold to PLN.
•
West
Sulawesi (Mamuju): the WP mill will be built by MCA-I (Millennium Challenge
Account-Indonesia) with a capacity of 600 tons / month, and energy plantations
will come from HTR (Community Plantation Forest) and HR (Hutan Rakyat) prepared
red calliandra 748Ha. On the other hand, a foreign investor from South Korea PT
Bara Indoco (May 2018) invested their funds via IUPHHK (Forest Timber Product
Utilization Permit) (sengon & Kaliandra) HTI 27,300Ha (around 700m3 of
wood, 200,000 tonnes / year WP) in 3 sub-districts ( Tapalang 14.865Ha, Tommo,
Kalumpang) in Mamuju (Sulbar). The 80,000 ton / year factory will be built in
Belang-belang Kec. Kalukku.
•
Papua:
(Merauke) IDEAS in collaboration with PT SIS (Selaras Inti Semesta, MEDCO
Group) conducted an FS (Feasibility Study) on the integration of energy
plantation forests and the construction of a WP factory.